Morgan 43, Hull #65
|
| Ice
Box RE-INSULATION
Layout - Design - Build Winter 2008 REVISED 3/9/2008 |
![]() Bubble foil seals the complete area.
|
![]() Had to relocate front door lower. |
Freezer temporally installed. FITS! Tubing will go behind stove to compressor to the right of the sink cabinet. |
![]() Large air holes for the compressor. |
Bottom shelf to upper ref box & side being fiberglassed. Two layers of glass and three coats of Epoxy on all parts. |
![]() Epoxy Resin-DOES NOT SMELL!!! (Defenders) Epoxy can't be gel-coated so I used white pigment in the Epoxy. Worked Great! |
53" x 12" Evaporator plate bent and ready to install.
Freezer area will have a overflow hole to allow cold air to flow into the Frig. section if needed. A trap door will shut if no air is needed. A fan will be mounted in the frig area to draw air when or if needed. If I did not plan it now it would not happen later. FREEZER BOX |
LOWER FRIG BOX with front loading door. Bottom shelf of TOP FRIG BOX has a tray to catch the melt off from the cold plate and holes in the side of the tray will allow cool air to fall to the bottom box. |
The three boxes ready to fit in the boat. |
![]() Bottom ice box with lower door. |
![]() Freezer box |
Top ice box and freezer |
|
|
January 12th, 2008 Final installation of all three boxes!!!!!!!
|
![]() Compressor Location Counter base Ply Counter Base Ply Holding Plate Melt Tray |
|
January 20th, 2008 Ordered Corian from http://Solidsurface.com They sell large cut off pieces. Approx. sizes available were 4 pieces at 24" x 49" This is the color that Michele wanted and we lucked out finding it!!!!
|
![]() Corian cuts like wood with a carbide blade. Makes lots of dust and smells. Do "Out-Doors" For more details on the counter go to http://kindred-spirit.net/morgan43/galley/galleycounter.html |
|
March 9th, 2008 Time to put the remaining pieces in. http://kindred-spirit.net/morgan43/galley/galleycounter.html |
Happy Sailing!
Al and Michele Watson
Back to KINDRED SPIRIT Upgrades Page